Contact Us

Contact us on T: +44 1296 625 617 or
E: engineering@fairleadmaritime.co.uk
Alternatively, use our contact form below.

History

In the early years of Fairlead Maritime we specialised in numerical analyses like spectral fatigue, hydrodynamics and fracture mechanics assessments for the oil and gas industry. Our work soon became more varied and we now cover most aspects of the floating world  structural design, collision analysis, semi subs, jackups, mooring analysis, lifting gear, model testing, concrete fixings, NDE. We still work in oil and gas but its now more than 50% of our businesses is in offshore renewable energy, coastal structures and shipping..

 

Clients

ALLSEAS
BP
MAERSK
MPI
MTL
PROSAFE
SUNCOR
TALISMAN
VAN OORD
ZYBA (CCELL)

The early days

2011 Allseas : Pioneering Spirit

In 2011 Fairlead’s first project was to check the fatigue resistance of fatigue critical details of the largest ship in the world! Pioneering Spirit is 382m LOA, 124m beam and at deepest draught the displacement is 1 million tonnes. It can lift 40,000 tonne topsides and 25000 tonne jackets and is also the worlds largest pipe-layer.

This was the start of a good relationship with Allseas and over the next few years , after identifying the fatigue critical areas we designed many fatigue critical parts of the hull, including the connections of the twin bows to the main hull, the scarphing brackets which connect the super structure to the main deck, the ends of the lifting rails. This was a great project to contribute to; we were honoured to be chosen to solve such difficult fatigue design challenges in partnership with Allseas, Lloyds Register and The Welding Institute.

Our work with Pioneering Spirit continued over the next few years. We carried out design verification of the 25,000 tonne lift shear legs at the aft of the vessel , the 48,000 lift at the bows and various design modifications, strength, hydrodynamics, fatigue and fracture mechanics assessments.

We also assisted Allseas with the design of the connections of the shear legs to the main deck and other aspects of the lifting gear

https://allseas.com/equipment/pioneering-spirit/

Screenshot from 2023-02-15 17-30-06

 

2012 Marine Technical Limits : FPSOs in the North Sea

In 2012 we carried out the first of many successful close collaborations with the excellent MTL, mainly life extension studies of FPSOs in the North Sea and North Atlantic. These vessels operate in a harsh environment for many years and it is always a challenge to safely keep them operating whilst repairs are carried out at sea, we like a challenge and continued with other FPSOs in the following years. Since the FPSOs operate in harsh environments in the North Atlantic and North Sea we used some advanced spectral fatigue and fracture mechanics to reduce downtime and to be sure that the repairs and.or operational changes would keep the vessels operating safely. The end clients were Maersk, Talisman, Suncor.

Bleo-Holm-26042013

Spreading our wings building relationships

2012 MPI: Jackups, renewables and wind turbines

In 2012 we carried out our first site specific assessment for MPI Adventure, which at the time was the largest self elevating wind turbine installation vessel in the world, it has a 1000 tonne crane at the aft end whihc is uses to install turbines, piles, topsides and other parts of offshore windfarms. It has six seventy metre long legs to jack it up above the crest of the waves. This was the start of many enjoyable and productive years working with MPI (now part of Van Oord. Our work encompasses site specific assessments, punch through risk assessments, structural modifications, repairs, fatigue design, technical investigations,  model testing, and problem solving. Over the years we developed our own in-house software to carry out ISO 19905 time domain stochastic analyses of the loads on spudcan foundations, to calculate sea fastening loads and to calculate air gaps whilst transporting components offshore.

Screenshot from 2023-02-15 18-13-38

 

2013: PROSAFE: Semi Submersibles

We started working with PROSAFE on life extension of a GVA3000 semi-submersible and a collision assessment in the Grane field of the North Sea. PROSAFE were a great team to work with and over the years we carried out more than eighty projects for them including fatigue assessments, collision assessments, full scale model overload tests of windows, structural modifications, new build design verification, predicting slamming loads, deriving operational limits and covered many fields in the North Sea.

 

2013: BP : design specifications for Tankers

We helped BP to update their design specifications for new build tankers to reduce the risk of green seas on the deck. We carried out hydrodynamic calculations and statistical analysis and derived new limits with input from MARIN

 

 

Timeline 2011 till 2020 

DESCRIPTION

YEAR

COMMENTS

Vessel Type

Quick fatigue assessment of new build heavy lift vessel

2011

Successfully Completed “Quick” spectral fatigue (FDA3) in two weeks to aid with steel order design freeze.

Identified details with low fatigue lives and delivered recommendations for design modifications. Subsequently the findings were confirmed by analysis from Class and yard

Heavy lift

Fatigue assessment (FDA Level 3) of hull structure of heavy lift vessel

2011

Design wave screening and spectral fatigue (FDA3)+ recommendations for design improvements

Heavy lift

Appraise stage analysis of cracks in COT of FPSO for life extension decisions

2011

Fatigue assessment for the appraise stage of Ross and Blake field Upgrade. In two months we completed drawing review, spectral fatigue assessment, Rule Based check, and recommendations.

FPSO

Engineering Criticality Assessment of welds in castings

2011

Worked with The Welding Institute, owner and Class to predict fatigue lives of partial penetration butt welds.

Heavy lift

Strength and Fatigue assessment of hull structure in way of lifting gear

2012

Reduced project time by getting agreement from class to use a combined long term stress and fatigue assessment rather than separate strength and fatigue assessment.

Heavy lift

Fatigue assessment of hull structure in way of new build sheerleg

2012

Identified 12 critical areas. Yard accepted all recommendations. Confirmed non-redundant structure robust

Heavy lift

Check of shear stress in welds adjacent to the strength deck

2012

Work carried out at short notice to assist the owner with discussion with the yard. The yard agreed to increase the weld sizes and subsequently confirmed by their own analysis

Pipe layer

Strength check of foundations of sheer legs

2012

Assisted owner and yard with ECA assessment of thick plates to determine need for post weld heat treatment

Heavy lift

Displacement of lift system

2012

Used by client design of lifting gear

Heavy lift

In place analysis of self-elevating unit

2012

First SSA from Fairlead, carried out at short notice, delivered an early report and the vessel sailed on time.

Jackup

In place analysis of self-elevating unit

2012

Various Site assessments for elevated storm survival condition

Jackup

Investigation of buckling of legs of self-elevating unit during leg extraction

2012

Detailed analysis of leg buckling during excessive inclination of jackup unit. Root cause and recommendations for repair.

Jackup

Hydrodynamic and risk analysis of green seas on bow, input to new build design standards

2012

Delivered to a very tight schedule. Client incorporated risk analysis into new build specification for the largest order of new build tankers in the world of 2012.

Tanker

In place analysis of self-elevating unit

2013

Site assessment for new field. Identified preload risk areas overlooked by warranty surveyor.

Jackup

Repair procedure for legs of self-elevating unit

2013

Check of repair, check of deflections and stress during repair. Identified design improvements in way of welds. Identified buckling issue and solution in way of temporary reinforcement. All recommendations implemented by client.

Jackup

Repair afloat of bottom floors in way of crane of lift barge

2013

Checked induced and residual stress due to repair afloat. Identified buckling issue with proposed repair.

Jackup

Punch through risk assessment for self-elevating units and safe weather windows

2013

Assessment of punch though risk and development of safe weather windows with reduced preload. Job turned around at short notice and client able to carry out lift

Jackup

Transportation study for cargo with 40m overhang from deck side

2013

Calculation of short and long term statistics of relative wave elevation in a restricted weather window. Worked with operator to develop allowable heading rosettes and roll monitoring procedure.

Jackup

Hydro validation and update of clients internal procedures

2013

Third party validation of client’s hydrodynamic calculations. Update of clients internal programs and calculation sheets.

Jackup

Check of deck capacity of transportation vessel when carrying heavy deck load

2013

Deck load exceeded class allowable. Site specific design wave analysis demonstrated compliance with class requirements. Class approval completed, class fees under budget

Jackup

Damage investigation and repair

2013

Damage to bottom structure caused 200mm indentation. Root cause analysis via nonlinear plastic analysis and calibration with digital scans. Recommendations for repair. Repair carried out

Jackup

Bottom stabilised lift

2013

Determine weather windows for bottom stabilised lift with wind wave and current. Worked with the owner and Warranty Surveyor. Warranty Surveyor accepted and the lifts were successful, saved one month of time off hire and the project was completed on schedule.

Jackup

Root cause analysis, ECA, and solution of side cracking in FPSO

2013

Investigation of the mechanism of failure. Risk of future repair and maintenance. IIP developed via ECA for safe inspection intervals. All recommendations implemented.

FPSO

Life extension and In Service Inspection Plan of semi-submersible

2013

Spectral fatigue analysis, modifications and weld dressing to achieve 5 years inspection intervals. Updated IIP and yard work package to carry out the works.

Semi-submersible

Drag coefficients of jackup legs

2013

Literature review and CFD calculation to derive more accurate Cd values for octagonal legs at hyper critical Reynolds Number (4 e7). Lower drag coefficients accepted by Warranty Surveyor and Class. One extra month operation time achieved and works completed successfully without incident

Jackup

Collision analysis of floating unit and fixed platform

2013

Preliminary report delivered early to meet client’s contract negotiations. Damage stability check for minor risk of puncturing side tanks. Recommendations for reducing risk implemented.

Jacket

Collision analysis of floating unit and fixed platform

2013

Preliminary report delivered early to meet client’s contract negotiations. Damage stability check for minor risk of puncturing side tanks. Recommendations for reducing risk implemented.

Semi-submersible

Site assessment of Load out

2014

Site assessment of load out in heavy current for self-loading transportation vessel. Warranty surveyor accepted operating limits and loadout completed on schedule.

Jackup

Strength assessment of Semi Sub anchor bolsters

2013

Strength of bolsters for mooring loads in harbour. Linear static FE and rule checks of strength and buckling

Semi-submersible

Scour and punch through mitigation for jackup

2013

Scour and punch through mitigation for jackup vessel on superficial clay layer. Work carried out with geotechnics consultancy. Warranty surveyor accepted procedure and project completed on schedule.

Jackup

Strength check of welds in Walkway of Semi Sub

2014

Close out class comments about strength of poorly designed welds in escape walkway. Class comments were closed out.

Semi-submersible

Modification of spudcans to jack on boulders

2013-2014

Strength Assessment of modifications to spudcans of jackup vessel to jackup on seabed with embedded boulders. Feasibility study, costing and comparison of 4 alternative solutions. Worked with classification society to gain approval in time for project start. Helped shipyard with material grade sourcing.

Jackup

Air Gap and impact check of Semi-Submersible

2014

Checked impact loads on the deck of semi-submersible. Identified critical areas and carried out plastic analysis. Produced monthly risk matrix for green water at lifeboats.

Semi-submersible

ECA of one sided welds in 40mm plate

2014

Class requested annual inspection of one sided welds in 40mm plate. Plate difficult to inspect. Crack propagation assessment. Resolved class concerns about root cracks, inspection intervals increased from annual to round robin 5 years interval, with 15% of locations inspected each five years.

Jackup

Model tests of jackup legs

2014

Model tests carried out for jackup legs, Built model, measurement system, towing system. Drag coefficients obtained, increased operational season by approx. one month.

Jackup

Site assessment of jackup on limestone bedrock.

2014

Site assessment of jackup working on near surface bedrock of friable limestone. Worked in conjunction with geotechnics consultancy. Warranty surveyor accepted report and client secured hire contract.

Jackup

Assessment of pile oscillations.

2013-2014

Assessment of pile oscillations for pile installation vessel. Time domain simulation of double pendulum, statistical analysis of response. Production of traffic light matrix for allowable seastates.

Jackup

Strength and fatigue design of wave energy converter

2014

Partner in consortium developing a wave energy converter, winner of Innovate UK awards. The device is 50% more efficient than existing units. Structural design of model test and large scale sea trial, approved by UK MMO for use near shore in the Solway Firth.

Energy device

Design appraisal of new build North Sea FPSO

2014

Overview of fatigue performance of primary and secondary connections. Work carried out in two phases to meet yard design schedule. Yard agreed with and implemented all recommendations.

FPSO

Root cause analysis and solution of cracking problem on FPSO

2014

FPSO in harsh environment cracks at COT boundary. Recommendations provided in four weeks turnaround. Fabrication drawings. All recommendations agreed.

FPSO

Review of client longitudinal strength calculations

2014

Update of client tools for strength check. Improved calculation and identified errors in the Class approved yard longitudinal strength calculations and Trim and Stability Booklet. Report submitted as part of client’s tender, client won the contract.

FPSO

Bunkering weather window limits

2014

Client wished to bunker in part open water, weather window derived based on hydrodynamic calculations and derivation of loads from metocean reports. Client cut turnaround time in port and saved approx. 5 days on the project.

Jackup

Site assessments of Jackup

2014

Various site assessments of jackup units

Jackup

Air gap and impact check of Semi-Submersible

2014

Airgap check for lifeboats, impact loads and strength of main deck

Jackup

Repair recommendations for minor crack in semi-submersible main deck

2014

Advised repair team on bracket sizes. Temporary repair procedure. Worked with TWI to confirm weld procedures and consumables.

Semi-submersible

Training for buckling and strength

2014

Training clients engineers for Marine Rules

Training

Longitudinal Strength

2014

Spreadsheet tool for planning marine operations

Jackup

Intact and Damage Stability

2013-2014

Update of damage stability cases for collision study. Intact Stability spreadsheet tool for planning marine operations,

Semi-submersible

Fatigue analysis and determining safe inspection intervals

2015

Fatigue screening and determine safe inspection intervals for existing units

FPSO

Transportation studies

2015

Specification of grillage height to achieve design weather window during transit.

Jackup

Increase of preload of jackup

2015

Determine capability of hull to increase preload to increase foundation strength and storm survival Hs.

Jackup

Various SSA of jackups

2015

SSA to ISO19905 , geotechnical, structural and hydro checks. Strategies for managing scour punch through and other risks

Jackup

Producing allowable loading plan for strength deck

2015

Determine allowable sea fastening loads at frame girder intersections and distributed and intermediate loads. Produce loading plans

Jackup

Mooring calculations

2015

Check and redesign of mooring lines to DNV rules.

Jackup

Update of client hydrodynamic tools

2015

Update clients in house Hydrodynamic analysis tools

Jackup

Design of hydro electric turbine installation

2015

Tidal energy recovery system from dock gates

Energy device

Remedial repairs to hull in service

2015

Remedial repair, fabrication drawings, weld sequence and class approval for repair in service

FPSO

Peer review and trouble shooting of modification to offshore unit

2015

Assisted owner to manage over design and scope creep of strengthening in way of new process topsides plant

FPSO

Crane foundation design

2015

Design of pedestal and deck strengthening

Semi-submersible

Lifeboat and davit launch design

2015

Various projects involving upgrade of lifeboats and FRC to LSA code

Semi-submersible

Feasibility study for FPSO West of Shetland

2015

Check airgap and slamming loads in Solan field

FPSO

Peer review and recommendations to improve fatigue life of new build FPSO

2015

Reviewed yard proposals, identified low fatigue lives based on damage incidents and rule requirements, made recommendations for reinforcement, yard accepted and implemented the change

FPSO

Life extension, scantling reassessment

2015

Thickness measurements with wastage above 2015 rule allowable but less than build stage rule allowable. Reassessed scantlings to new rules and Class approved the thinner plate as “as built”

Semi-submersible

Local deck strength

2015

Check deck strength in way of heavy topsides

Semi-submersible

Docking plan

2015

Peer review of docking procedure on a lifting barge. Identified misalignment of load path and shear yield, minor redesign of grillage to avoid yield. Docking completed without incident.

Jackup

Design of anode attachment system

2015

Design of anode attachments for piles, design halved the installation time of the project.

Coastal

Cable protection

2015

Weather protection for underdeck cables to comply with MODU code and lower wave impact pressures

Semi-submersible

Safe inspection interval and in service inspection plans

2015

Update of clients in service inspection plans using in service data from and guidance from IIW. New inspection plan approved by class

Semi-submersible

SSA: Foundation design for heavy lifts in port and in the field

2016

Calculation of max static, functional and environmental loads during lift in harbour and offshore in the 50 year storm. Design of foundations for the extreme loads.

Jackup

Engineering Criticality Assessment and In Service Inspection Plan

2016

Spectral fatigue analysis, fracture mechanics, crack growth rates, specification of NDE and safe inspection intervals

Semi-submersible

Life Extension of MODU

2016

Reassessment of existing non redundant structure to new Rules, design wave analysis

Semi-submersible

Life Extension of MODU

2017

Reassessment of existing structure to new Rules, design wave analysis, fatigue analysis , crack growth and ECA to determine safe inspection intervals

Semi-submersible

OTG13 assessment of MODU

2016

Check risk of slamming impact. Hydrodynamic analysis to calculate relative wave elevation and airgaps

Semi-submersible

Reinforcement of MODU for wave impact

2017

Elasto-plastic analysis via hand calcs and Nonlinear dynamic finite element analysis Design of reinforcement to class rules. Inspection of steel work work offshore.

Semi-submersible

SSA of offshore wind farm with risks of punch though and minimal airgap

2017

Managing risks of jacking in areas with a risk of punch through by accurately calculating the loads at the foundations

Jackup

Mooring analysis in port

2017

Develop mooring plan and allowable wind speeds for mooring a jackup unit in port

Jackup

Design of resin anchors for floating bollard system

2017

Calculate of design loads, design resin anchor and reinforcement of concrete in way of attachments of a floating bollard system to a lead in jetty.

Coastal

Upgrade of lead in jetty to allow crew transfer vessels for offshore wind farm to moor

2017

Check steel structure and make recommendations for improvements to meet the design standard

Coastal

Design of seafastening for Launch and recovery System of an ROV

2017

Design welds and grillage to class Rules.

Semi-submersible

Risk assessment of green water on deck

2017

Check risk of green water and water ingress to accommodation block on the deck of an offshore unit. Recommendations to manage the risk were implemented

Semi-submersible

Survey and recommendations for cracking problem in superstructure

2017

Survey offshore of cracks in the superstructure, root cause analysis and recommendations for remedial action

Jackup

Various SSAs for installation of topside modules , substations and rotors by jackups

2017

Approved by warranty surveyor

Jackup

Establish safe limit of boulders on sea bed for jackup unit

2017

Approved by warranty surveyor

Jackup

Establish procedure for a self elevating unit to jack down in difficult ground conditions

2017

Approved by warranty surveyor

Jackup

Survey cracks in floating structures

2017

Used for subsequent redesign.

Semi-submersible

Design modifications to reduce risk of cracking

2017

Modifications approved by class, carried out by operator whilst on project, no downtime needed , cracks no longer occur

Semi-submersible

Pressure test of windows off floating structure

2017

Designed test rig and carried out to Class and Norwegian PSA requirements, Approved by Class. Vessel operating in harsh environment

Semi-submersible

Design of crane upgrade on floating asset

2107

Modifications approved by Class and successfully installed during special survey

Semi-submersible

Special survey of floating assert

2018

Identify critical areas and plan areas for inspection. Approved by Class

Semi-submersible

Slamming loads on offshore structure

2018

Design modifications and operational restrictions.Approved by Class.

Semi-submersible

HSE surveys of floating asset

2018

Identify critical areas and plan areas for inspection. Approved by Class

Semi-submersible

Reinforce windows of floating assert to withstand slamming loads

2018

Covers designed. Approved by Class. Fitted by owner offshore with no downtime,

Semi-submersible

Operating HS OTG14

2018

Safe operating Hs for floatel, approved by Class and implemented by owner

Semi-submersible

OTG14 assessment and reinforcements for various assets

2018

Reinforcements to meet Class and PSA requirements, Approved by Class. Modifications carried out

Semi-submersible

Renewal survey plan

2018

Planning areas to inspect based on predicted fatigue lives and safe inspection intervals.

Semi-submersible

Blast strength

2018

Checking strength of superstructure to withstand blast loads

Semi-submersible

Watertight doors

2018

Design of watertight doors and frame to withstand slamming loads

Semi-submersible

Operating HS OTG14

2019

Safe operating Hs for floatel, approved by Class and implemented by owner

Semi-submersible

Establish safe loading limits and inspection intervals to manage cracks in deck of FPSO in harsh environment

2018

Loading limits adopted, FPSO safely managed through winter till repairs in Summer weather window

FPSO

Various SSA of jackups

2018

Derived allowable Hs vs Tp. Approved by warranty surveyor

Jackup

Establish weather window for transporting overhanging cargo on heavy lift barge

2018

Derived allowable Hs vs Tp. Approved by warranty surveyor

Jackup

Root cause analysis of damage in lashing gear of jackup unit and recommendations for modifications

2018

Recommendations for improving the lashing system and fitting accumulators to maintain tension carried out

Jackup

Modifications and safe inspection intervals for cracks in jackhouse of self elevating unit

2018

Safe inspection intervals approved by class.

Jackup

Assist owner with discussions with PSA

2018

Acted as owner’s expert during discussions about structural integrity of the asset. Plan agreed with PSA

Semi-submersible

Operating HS OTG14

2019

Safe operating Hs for floatel, approved by Class and implemented by owner

Semi-submersible

Design practical repair for FPSO to be carried out during production on riser

2019

Repair approved by class and carried out by operator, FPSO safely continued till next planned docking

FPSO

Establish safe loading limits and inspection intervals to manage cracks in deck of FPSO in harsh environment

2019

Followed a successful project on a similar FPSO. Loading limits adopted, FPSO safely managed through winter till repairs in Summer weather window

FPSO

Establish safe loading limits and inspection intervals to manage cracks in bilge of FPSO in harsh environment

2019

Loading limits balanced with requirements to manage deck cracks as well.

FPSO

Survey and HAZID for floating structure

2019

Survey vessel and assist owner to develop HAZID

Semi-submersible

Site specific allowable Hs for operating

2019

Approved by Class

Semi-submersible

Software to automatically predict long term airgap and safe weather windows during transportation on heavy lift barge

2020

Developed potential flow code to carry out sea-keeping analysis and calculate long term airgap in arbitrary scatter diagrams

Jackup

 



“ I was really impressed with the 'can do' attitude ...your response was easily the best of the three organisations we had executing the same task ”

“ What more can I say? You all pulled the rabbit out of the hat. ”

“ Very pleased that things are ahead of schedule, thanks and well done. ”

“ Just a note to express my great satisfaction with the wave load determination work you carried out for me recently. I was really impressed with the 'can do' attitude towards getting us a satisfactory answer ”